Everyday

Concrete Calculator

Estimate concrete volume for slabs, columns, and footings — in cubic yards, cubic meters, and bags.

Slab / Patio / Sidewalk

Volume = Length × Width × (Thickness ÷ 12)

Formulas

Slab volume

L, W in feet; T (thickness) in inches

Column volume

D = diameter, H = height, both in feet

Tube footing

Do = outer diameter, Di = inner diameter

Cubic yards

Standard US ready-mix ordering unit

Cubic meters

Metric conversion

Bag count

60 lb ≈ 0.45 ft³, 80 lb ≈ 0.6 ft³

Why Cubic Yards?

Ready-mix concrete in the US is sold and delivered by the cubic yard (27 cubic feet), not by the cubic foot. Truck loads and supplier minimums are almost always quoted in yards.

This free concrete calculator estimates the amount of concrete necessary for a project and can account for different shapes and quantities — enter your dimensions and get yards, meters, and bag counts at once.

Quick formula

Length × Width × Thickness gives cubic feet. Divide by 27 for cubic yards.

Tips

Order extra: Always add 5–10% more concrete than the exact calculated volume to cover waste, spillage, and an uneven subgrade.

Thickness matters: Measure slab thickness in inches — a small error here has an outsized effect on total volume since it's usually the smallest dimension.

Bag size trade-off: 80 lb bags need fewer bags per job but are heavier to lift and mix by hand; 60 lb bags are easier to handle for DIY pours.

Multiple pours: Use the quantity field to multiply the volume when pouring several identical slabs, columns, or footings at once.

FAQ

Frequently asked questions.

How do I calculate concrete volume for a slab?

For a rectangular slab, patio, or sidewalk, multiply Length × Width × Thickness, all converted to the same unit (feet). Length and width are usually measured in feet, but thickness is almost always measured in inches since most slabs are only a few inches thick — so divide the thickness in inches by 12 before multiplying. For example, a 10 ft × 10 ft slab poured 4 inches thick is 10 × 10 × (4/12) = 33.3 cubic feet of concrete.

Why is concrete ordered in cubic yards instead of cubic feet?

Ready-mix concrete trucks in the US measure and sell concrete by the cubic yard, not the cubic foot, because a cubic yard (27 cubic feet) is a more practical unit for the volumes typical construction projects require. To convert, divide your total cubic feet by 27. Most concrete suppliers also enforce minimum order sizes (often 1 yard or more), so it helps to know your cubic yardage before calling for a delivery quote.

How many bags of concrete do I need for my project?

Bag count depends on bag size and yield: a 60 lb bag yields about 0.45 cubic feet of mixed concrete, while an 80 lb bag yields about 0.6 cubic feet. Divide your total volume in cubic feet by the yield per bag and round up. For example, 33.3 cubic feet requires 75 bags at 60 lb each, or 56 bags at 80 lb each — the 80 lb bags require fewer bags but are heavier to lift and mix.

How do I calculate concrete for round columns or footings?

For a solid cylindrical column or footing, use Volume = π × radius² × height, where radius is half the diameter. For a hollow tube form footing (a cylinder with a center void), subtract the inner cylinder's volume from the outer one: Volume = π × height × (outer radius² − inner radius²). Both formulas return cubic feet when diameter and height are entered in feet, which you can then convert to cubic yards or bags.

Should I order extra concrete beyond the exact calculated amount?

Yes — always add a waste and spillage buffer of roughly 5–10% on top of your calculated volume. Uneven subgrade, form leakage, over-excavation, and minor measurement errors almost always mean a project uses more concrete than the pure geometric calculation predicts. Running short mid-pour is far more costly and disruptive than having a little extra, so most contractors round up their order to the nearest half or full cubic yard after adding this buffer.

What's the difference between cubic yards and cubic meters for concrete?

Cubic yards are the standard unit for ordering ready-mix concrete in the United States, while cubic meters are standard in most other countries. One cubic yard equals about 0.7646 cubic meters, or equivalently one cubic foot equals about 0.0283 cubic meters. If you're ordering concrete internationally or working from metric project plans, converting your cubic-foot volume directly to cubic meters (multiply by 0.0283168) avoids confusion with suppliers.

Last updated: August 17, 2026